Wednesday, January 2, 2013

I have found out that the tank trike began life as a "WRFF" trike (see picture)not the front end of a go-cart as the seller indicated with a smaller rear wheel and no suspension. This doesn't impact my immediate plans but showed me that it originally had a running board or floor board mounted on the front of the main tube. That's something worth considering closer to completion of my changes.

Saturday, December 15, 2012

Evel er.. Ian's 1st test ride

Evel ... Ian took the first real test ride today. He loved it! The handlebars are much more comfortable and the coaster brake worked great. Some tweaks are in order but it works well so far.

Friday, December 7, 2012

Phase 1 completed on Tank Trike!

The first shot is the tank with the upper bars cut down to below 4 feet off the floor! Important but I found the bar ends didn't fit, I cut the handlebars from the steerer tube
and inserted an aluminum boom stem from an old recumbent bike project and topped it off with a Scott AT-1 handlebar and the bar ends! Saved a lot of weight, made it so you can ride with your arms at a comfortable level and gained a bottle cage mount and cable mounts. The boom bolts need to be shorter but if it's dry tomorrow a test drive will be attempted. See previous post for more pictures of the tank.

Monday, December 3, 2012

New project picked up, assembled and test ridden!!

This is the newest eBay find. Couldn't pass it up. I wanted to give us a choice of wheels that could go off-road, we have a rails to trails trip coming up. :) The first priority is changing/lowering the Handlebars. The wooden measure in the picture is 4 feet. They are pictured at the lowest possible position and are still about 2 feet above the seat. That means it's not too comfortable, has more slop in the steering than ideal. However, I rode around for awhile and as is, and it floated over gravel, curbs and such with ease. It could afford to drop a couple of pounds. I will keep posting this time I promise. Maybe I'll make an instructable: how not to document a project!

Sunday, April 8, 2012

Spring has sprung!

Finally, got the wife and kids out to the park with me today! Rode my Bike-E, the wife's cannondale Mtn bike has been revived and My older son rode his custom trike with the seat in back for his brother! Next time we bring the camera.

Wednesday, July 13, 2011

Gotta clean shop and make room - recumbent frame goes

I have a counterpoint presto recumbent bicycle frame which I purchased with a plan to built it up. Reality intruded in the form of my responsibilities as a dad. I installed a new headset, folding stem and handlebars. It has a comfy web seat and uses 20" 451 wheels and I have two brand new premium wheels with new tires and tubes. I would be willing to trade the trade and possibly the wheelset for something more practical: a "hike a bike", good 20" trike wheels rear or front (W/drumbrake or dynohub?), OCC Stingray parts, high grade mountain bike. I'm open to suggestion and would potentially be willing to meet up to arrange to swap our respective bits in the NY/NJ/PA/CT/MA area...


Saturday, June 4, 2011

Replaced trike handle bars, AGAIN

I had given up on the 1st set of replacement bars, they were not the correct size for the stem and my work around didn't hold it securely. I was literally on my way to "The Lab" to look for a replacement, when I hit a pothole and the screw snapped, eliminating the possibility of further delay. While I was there, I collected some mountain bike brake pads and adjusted the hub brakes. My dad cut down the excess bolt length in the breadbox with a Dremel for me. I'm looking for a pitbull on ebay to replace the whole sidepull brake unit. Got to have optimum braking power with a kid on the back!